ANALISIS PERCEPATAN WAKTU DAN BIAYA TERHADAP KETERLAMBATAN PROYEK PADA PENINGKATAN JALAN RING ROAD AIMAS KM.18 – PESANTREN KM.27 - MAKBUSUN MENGGUNAKAN METODE CRASHING PROGRAM. (2025). Jurnal Karkasa, 11(1), 14-21. https://doi.org/10.32531/kdac0v45