“ANALISIS PERCEPATAN WAKTU DAN BIAYA TERHADAP KETERLAMBATAN PROYEK PADA PENINGKATAN JALAN RING ROAD AIMAS KM.18 – PESANTREN KM.27 - MAKBUSUN MENGGUNAKAN METODE CRASHING PROGRAM”. 2025. Jurnal Karkasa 11 (1): 14-21. https://doi.org/10.32531/kdac0v45.