“ANALISIS PERCEPATAN WAKTU DAN BIAYA TERHADAP KETERLAMBATAN PROYEK PADA PENINGKATAN JALAN RING ROAD AIMAS KM.18 – PESANTREN KM.27 - MAKBUSUN MENGGUNAKAN METODE CRASHING PROGRAM” (2025) Jurnal Karkasa, 11(1), pp. 14–21. doi:10.32531/kdac0v45.