[1]
“PENERAPAN MODEL POPULASI KONTINU PADA PERHITUNGAN PROYEKSI PENDUDUK (STUDI KASUSDI KECAMATAN SINONSAYANG): APPLICATION OF CONTINUOUS POPULATION MODEL IN POPULATION PROJECTION CALCULATION (CASE STUDY IN SINONSAYANG SUB-DISTRICT)”, jsoscied, vol. 7, no. 2, pp. 618–628, Nov. 2024, doi: 10.32531/jsoscied.v7i2.859.