Mandela, W., & Sitepu, C. (2023). ANALISIS WAKTU DAN BIAYA BERDASARKAN PRODUKTIVITAS TENAGA KERJA PADA PROYEK PEMBANGUNAN GEDUNG KIR KOTA SORONG. Jurnal Karkasa, 9(2), 30-35. https://doi.org/10.32531/jkar.v9i2.468